Step 2 - Prepararing to Move Bath House 4 Ready, Set,...Go!
2/4/05: The contractor begins driving the pilings at the new site. 2/22/05: The pilings are ready and the lift station has been started. A lift station is a pump that pushes wastewater to a point in the sewer system at which gravity can take over the flow to a treatment facility. 3/16/05: The supporting cross pieces are almost complete. 3/30/05: The roadways have been cleared and the beams completed. The bath house 4 decking has been removed. Note the extensive corrosion on the existing hardware.